DHK-2026-0315ResolvedHigh priority

Waterlogging in front of the school for a month

Ramna, school approach road

Every shower puts 15cm of water in front of the school entrance. Children have to be carried across. The gutter here is 30cm below the road surface and has not been cleaned.

Time from report to resolution

13 days 1hfiled 22 Sept 2026 · resolved 5 Oct 2026

The clock ran from the moment a resident filed this to the moment the department marked it resolved.

Progress

  1. Reported22 Sept 2026 · 08:15
  2. Acknowledged23 Sept 2026 · 09:00

    WASA drainage zone

    Gutter cleaned as an interim measure.

  3. Work in Progress1 Oct 2026 · 10:00

    WASA drainage zone

    Gutter re-laid and regraded to fall correctly.

  4. Resolved5 Oct 2026 · 09:20

    WASA drainage zone

    Tested through two rain events. Water clears within ten minutes.

Department’s statement

Response from Dhaka WASA

Regraded the gutter so it falls the right way, then verified through two rain events before closing.

Same category

Also on this desk

Drainage channel filled with construction waste

Uttara Sector 7, channel beside the schoolWard 1, Uttara Sector 7

Drainage & WaterloggingMedium priority189 people have flagged this
DHK-2026-0143Work in Progress10 days 3h waitingOver a week