Drain blocked, every shower floods the ground floor
Mirpur 14 Circle, eastern sideWard 5, Mirpur 14
DHK-2026-0413Resolved4 days 21h
Demra canal bank, beside the sluice
A new outfall pipe has been laid with no screening. Solid waste is going straight into the canal, which is now choked for about 200m downstream.
Time from report to resolution
The clock started when this was filed and stops when the department marks it resolved. It is currently at the "Acknowledged" stage.
WASA drainage zone
Screening to be added. Downstream clearing to follow.
Still open
This report is at the Acknowledged stage. The next step is Work in Progress. Nothing has been marked resolved, so the clock is still running.