DHK-2026-0413ResolvedHigh priority

Drain blocked, every shower floods the ground floor

Mirpur 14 Circle, eastern side

The box drain at the circle is choked with plastic and silt. Any rain over about ten minutes puts 20cm of water across the road and into the shops. It has flooded four times in the last two weeks.

Time from report to resolution

4 days 21hfiled 9 Oct 2026 · resolved 14 Oct 2026

The clock ran from the moment a resident filed this to the moment the department marked it resolved.

Progress

  1. Reported9 Oct 2026 · 14:26
  2. Acknowledged10 Oct 2026 · 08:40

    WASA drainage zone

    Jetting crew scheduled.

  3. Work in Progress12 Oct 2026 · 07:00

    WASA drainage zone

    Silt and roughly 300kg of plastic removed.

  4. Resolved14 Oct 2026 · 11:15

    WASA drainage zone

    Flow tested with a hose run. Drain cleared and manholes reseated.

Department’s statement

Response from Dhaka WASA

Cleared the drain and removed the obstruction. Asked the ward office to add this point to the pre-monsoon cleaning list.

Same category

Also on this desk

Drainage channel filled with construction waste

Uttara Sector 7, channel beside the schoolWard 1, Uttara Sector 7

Drainage & WaterloggingMedium priority189 people have flagged this
DHK-2026-0143Work in Progress10 days 3h waitingOver a week